Bill the Month Just Finished

Set a monthly contract to invoice on the 1st for last month's service, and pick the first month OpsVara bills when a customer moves over mid-term.

Updated November 11, 2026

A contract on Monthly on a fixed day has always invoiced the month the invoice goes out in: the bill dated November 1 covers November. Many companies bill the other way round — the bill on the 1st covers the month just finished — and a customer moving over from another system mid-term has usually already paid the current month there. Two settings cover both: Bill For under Invoice Options, and First Billing Month next to the agreement dates on New Contract and on New Quote.

Both apply only when When to create invoices is Monthly on a fixed day.

Bill For

Bill For says which month a monthly invoice covers:

OptionWhat the invoice on your billing day covers
The month the invoice goes out inThe current month. The invoice dated November 1 is for November. This is the default and how every existing contract behaves.
The month just finished (arrears)The previous month. The invoice dated December 1 is for November.

A plan with a Per visit (billed monthly) row always bills The month just finished: its visits can only be counted once the month has ended. Bill For is locked there with the note Per-visit prices bill the month just finished. Creating the contract, saving its Invoice Options or Service Scope, renewing it, or importing it sets this for you, whatever the company default says. An older contract changes when you next save Invoice Options — see Bill Per Visit on a Monthly Invoice. On a flat monthly plan the dollars are the same either way; only the month named on the invoice, and the timing of the first and last invoice, change.

  1. Set the company default

    Open SettingsTemplates, Terms & BillingInvoice Defaults. Under Company Invoice Defaults, with Monthly on a fixed day selected, set Bill For and click Save. New contracts, and contracts created by the onboarding import, start from this setting. A quote template with its own Invoice Options takes over for its work type, so set it there instead when the template carries one.

  2. Set it on one contract

    On New Contract, click Change beside Invoice Options and set Bill For. On an existing contract, open it under Sales and BillingContracts, click the pencil beside When To Create Invoices (or Bills For) on the Invoice Options card, change Bill For, and save. Changing it counts as a schedule change, so OpsVara asks you to confirm and then rebuilds the planned invoice slots.

  3. Create any month the switch left behind

    Switching moves every planned month to a new billing day, and some may now fall on a day that has already gone by. The automatic runs only draft a month on its billing day, so after the save the Invoice Options card lists those months, each with its billing day and a Create now button. Create each one that still needs an invoice, or click Dismiss if it was billed another way. Moving the billing day or First Billing Month earlier on a monthly contract lists months the same way. Adding a per-visit row under Service Scope switches Bill For too, and the Service Scope card shows the list. Changing a contract to monthly from another schedule lists nothing, because the old schedule billed those months.

  4. Check the plan

    The contract's invoice plan still names each slot by the month it covers. Under The month just finished, each slot also shows when it will be billed — Monthly billing 2026-11 (billed 2026-12-01) — and the last month of the term is billed on the billing day after the term ends. The draft is made on the billing day, once the month has ended in your time zone (early morning in US time zones) — the time zone set under SettingsCompany.

What the customer sees

The contract card reads Bills the month just finished, and the customer's printed agreement carries the same line. Invoice line items name the month covered — Monthly billing 2026-11 — not the billing date.

Lawn Care accounts

A new Lawn Care account starts with two default quote templates: Lawn Maintenance bills Monthly on a fixed day on the 1st for The month the invoice goes out in, and Lawn Treatment bills After each visit. Both are due 15 days after the invoice is sent (Net 15). New agreements and approved quotes for those work types start from them until you change, replace or delete the templates under SettingsTemplates, Terms & Billing. Add your lines to those templates rather than creating new ones. Set the company default above does not change their schedule. Until you save a starter template yourself, its due date follows the payment terms (days after sending) you give the company there or under Payment terms (net days) in the SettingsSetup Wizard; once you save it, it keeps its own. If you use Save as Template on a quote with no invoice schedule of its own and make it the default while a starter is still unedited, the new template keeps the starter's schedule and due date. To bill Lawn Maintenance for the month just finished, or to change a due date for good, set Bill For or Due Date on the template itself, or choose Company default on it to follow the company setting. A quote or agreement can still set its own Invoice Options.

First Billing Month

Service can start before billing does. A customer who joins on November 1 but already paid November to their previous provider should be scheduled from November and invoiced from December.

  1. Start the contract when service starts

    Set the contract's start date to the first day OpsVara schedules visits. A contract that starts in the future is invisible to scheduling until that day, so do not push the start date out to avoid a bill.

  2. Pick the first month to bill

    On New Contract, set First Billing Month next to the agreement start and end (monthly schedules only). The note under the field reads Blank: billing starts with the agreement. until you pick a month, then No invoice before Nov 2026. The totals count from it. (the month you picked). On New Quote, the same field is First Billing Month (Optional) under Agreement Period (Optional), only when the quote creates a new contract on a monthly schedule — a quote that adds to or replaces a contract does not show it. On an existing contract, the Invoice Options card shows First Billing Month once it is set; click the pencil beside When To Create Invoices to change it. Months before it get no invoice slot at all. Under The month just finished, the first invoice then goes out on the billing day of the following month — a first billing month of November bills on December 1. Work done before it is not billed either: add-ons and chemicals from visits completed before the first billing month are not added to any monthly invoice. Those visits stay unbilled on their jobs, so invoice one from its job if it needs billing.

  3. Confirm on the contract

    The Invoice Options card on an existing contract shows First Billing Month once it is set, and the plan starts at that month. Editing other invoice options later keeps it; clearing the field removes it, and the earlier months come back onto the plan.

A Season Already Under Way

On New Contract, a Seasonal agreement on Monthly on a fixed day whose start date is in an earlier month gets First Billing Month filled with the current month. A lawn season that opened April 1, for a customer signed in October, keeps April 1 as its start date, so the printed term stays as sold, and billing starts in October. On a plan billed on the 1st, billing from April instead would leave April through September planned but never drafted, and October would not be drafted either. When the contract bills The month just finished, it fills last month until this month's billing day, because last month is still invoiced automatically on that day.

A note under the dates says which months will not be invoiced, for example "Billing starts in October 2026, so earlier months are not invoiced." To bill earlier months, set First Billing Month to the first month the customer owes, save, then use + Create Invoice on the contract for each month the note says is not invoiced automatically. Once you change or clear First Billing Month, New Contract leaves it as you set it. Annual and Ongoing agreements are not changed: First Billing Month stays blank, so billing still starts with the start date, and the note lists the months that will not be invoiced automatically.

The installment splits the total across the billed months

With a First Billing Month, the Typical installment divides the Contract total by the months from the First Billing Month to the end date, so the invoices still add up to the total: $1,200 from September to August, billed from November, is ten invoices of $120. A Per month price already totals only the billed months, so its installment is the monthly rate: $355 a month on an October–December plan billed from November is a $710 total and a $355 installment, not $236.67. A Per visit (billed monthly) total is a forecast of the billed months' visits, so its installment is the average forecast month; each invoice bills the visits actually completed. Create Contract shows the count under the installment. On an existing contract the installment is recalculated when you change the total, the service scope, the dates or the First Billing Month itself; moving the First Billing Month on a Per month or Per visit plan recalculates its total from the rate too, unless you typed the total yourself or the contract carries a discount from its quote (its total stays as it is and only the installment is recalculated). When you edit the price (the pencil beside it) and change Contract Total ($), leave Typical Installment ($, optional) as it is and it is recalculated for you; an installment you type yourself is kept. Moving the First Billing Month within or before the start month changes nothing, because the same months are billed. A contract you have not edited keeps its current installment. None of this changes what a Per month plan's invoices bill — each one bills the monthly rate.

Contracts that started before this setting existed

Some contracts were given a first billing month by your onboarding contact during a migration before the field was on screen. Editing Invoice Options on those contracts now keeps it; it is shown on the card like any other value.

Pond, Lake and Equipment Contracts on Annual or Ongoing

Pond Maintenance, Lake Treatment and Equipment Service offer Seasonal, Annual and Ongoing — tick the ones you sell under Service terms in SettingsWork Types. A warm-climate pond or fountain company often runs year-round, so the longer terms are there for it.

On New Contract, picking Annual or Ongoing for a pond, lake or equipment contract switches When to create invoices to Monthly on a fixed day, billing the contract price. The seasonal schedule — one invoice once the term's work is done — would bill a twelve-month contract once, a year in. When your company default is already Monthly on a fixed day, its billing day is kept. Switching back to Seasonal restores the schedule the form showed before. Once you have changed Invoice Options yourself (or a template or copy set them), New Contract leaves them as they are.

Lake Treatment offers Seasonal, Annual and Ongoing. On Seasonal a lake contract works as before: treatment rounds (First / Second), the Season (Year) box instead of dates, and invoices after the early and mid-season visits. On Annual or Ongoing it is a dated contract like a pond contract: Agreement Start and Agreement End on Annual, Service Start and Renews On on Ongoing, a visit schedule, and the normal Invoice Options (Monthly on a fixed day, After each visit, and the rest), with no treatment rounds and no permit season. Its catalog round rows are added as ordinary tracked rows, and the permit-fee row is left out. Visits are created from the contract's own schedule. If your company saved Lake Treatment as Seasonal-only under SettingsWork Types, tick Annual or Ongoing under Service terms there first.

Verify it worked

  • Open the contract's invoice plan. The first planned slot is the first billing month, and no earlier month appears.
  • Under The month just finished, every slot shows its billing date in the following month, including the last month of the term.
  • On the billing day, the draft appears under Sales and BillingInvoices with the covered month in its line items. A contract that bills the month the invoice goes out in, starts billing this month and is created after this month's billing day has this month's draft there as soon as it is created. One that starts billing in an earlier month has no draft for this month; create it with + Create Invoice if the customer owes for it.
  • The first monthly invoice carries no add-ons or chemicals from visits completed before the first billing month.
  • If the billing day's run could not draft a month, every office user gets one notification that names the contract. When the run drafted nothing else it is titled Scheduled invoice not created (Scheduled invoices not created for several contracts). When it also drafted invoices it is titled A scheduled invoice was not created (Some scheduled invoices were not created for several), and its text starts with the usual count of invoices created. The run does not try that month again; open the contract and click + Create Invoice to bill it.
  • On a Per month plan with a first billing month, the contract card's installment equals the monthly rate, and Total contract is the rate times the billed months.

Frequently asked questions

The customer already paid this month in our old system. How do I stop OpsVara billing it again?

Set First Billing Month to the first month OpsVara should bill. Months before it get no invoice slot at all, even though service — and scheduling — start on the contract's start date.

Why does the December invoice say "Monthly billing 2026-11"?

With Bill For set to the month just finished, the invoice that goes out on December 1 is for November's service, so the plan slot keeps November as its name and shows the billing date beside it — "Monthly billing 2026-11 (billed 2026-12-01)".

The contract ended on December 31. Does December still get invoiced?

Yes. A contract billing the month just finished drafts its last month on the next billing day after the term ends, even though the contract reads Completed or Expired by then.

An Ongoing plan renewed on January 1. Which invoice bills December's add-ons and chemicals?

The new term's monthly invoices do. On a plan that bills the month the invoice goes out in, each invoice is drafted on the billing day, before that month's visits, so it carries the add-ons and chemicals of the weeks before it. December's invoice cannot carry December's own work, so the next invoice of the renewed term adds it at the old term's prices, with the month on each line — "Salt Cell Acid Clean (December 2026)" — and the draft's internal note says "Includes work from the previous term". An invoice that carries such lines is never sent automatically. Automatically Send Draft Invoices, a contract that sends its scheduled invoices and a Send Draft Invoices campaign all leave it a draft, and it shows "This invoice includes work from the previous term — review it, then send it yourself." until you click Send To Customer. An invoice of the new term that carries nothing from the old one is sent as usual. A December visit that syncs after the January invoice is drafted is added to February's. Only add-ons that are billed when performed (a line whose How it bills is Each time it is done) and chemicals billed on usage are added; a line that is part of the monthly price is already on the monthly invoices and is not charged again. Only the end of the old term is looked at — its last month and the month before it, for a visit that synced late. Older work of the old term that is on no invoice is never added automatically; the first invoice of the new term says so in its internal note ("Not on this invoice"), so you can invoice it from its jobs if it was not billed another way. A visit you already invoiced from its job is not added again. An archived or cancelled previous term is not billed this way, and neither is one renewed into a term that bills the month just finished or per visit — the old contract offers Create Final Invoice for that work instead (next question), so it is billed once either way. Plans that bill the month just finished are not affected, because their December invoice is drafted in January and already carries December's work.

A monthly contract ended, or was cancelled or archived, and no new term bills its last weeks. What happens to their add-ons and chemicals?

On a contract that bills the month the invoice goes out in, the last invoice is drafted before the last month's visits, so their add-ons and chemicals are on no invoice. This also covers a contract you cancel or archive part-way (its last month is the last month that has an invoice, so work done after the November 1 invoice of a contract cancelled on November 20 is listed) and one renewed into a term that bills the month just finished or per visit. Once the contract reads Completed, Cancelled or Archived, the office gets one notification, "Ended contract has unbilled add-ons or chemicals" ("Cancelled contract…" or "Archived contract…" for those), and the contract page shows Add-ons and chemicals not yet invoiced with each line, the month it was done and the total before tax. Click Create Final Invoice to make one draft with those lines at the contract's prices. It is a draft for you to review, and nothing is sent. It shows "This invoice includes work from the previous term — review it, then send it yourself." and is left out of every automatic send and of Send Draft Invoices campaigns until you send it. The list holds add-ons billed when performed (a line whose How it bills is Each time it is done) and chemicals billed on usage from the contract's last month and the month before it; a line that is part of the monthly price is not listed, and older work that is on no invoice is not added (the draft's internal note says when there is some). A visit you already invoiced from its job is left out, and a second click finds nothing left to bill. A contract whose last invoice is more than about two months old gets no notification (it stopped long ago, and its work may have been billed another way), but its page still offers Create Final Invoice. A renewal that bills the same way carries the work only while it is a live term; if it is cancelled or archived, the old contract offers Create Final Invoice instead. Contracts that bill the month just finished do not need this, because their last invoice is drafted after the term ends.

I archived a contract mid-month. Does that month still get billed?

Not by itself — once a contract is archived, cancelled or paused, its billing day no longer drafts anything. So when you archive a contract that bills the month just finished and a month that has started is not billed yet, OpsVara asks first and lists each month with a checkbox and an estimated amount. Tick the months to bill. A month that has ended starts ticked. A month still in progress on a flat price always starts unticked and reads "in progress — ticking bills the full month"; tick it if the customer owes the full month. A month in progress with completed per-visit visits starts ticked. If an earlier month already has its invoice and its late visits can only go on the invoice of that month in progress, the earlier month starts unticked too and reads "already invoiced — its 2 late visits go on the invoice for October 2026; tick both to bill them". Bill It Now, Then Archive creates a draft for each ticked month (nothing is sent), then archives; a month left unticked is not billed and is noted on the customer's activity. With nothing ticked the button reads Archive Without Billing, which archives and leaves a note on the customer's activity that the months were left unbilled. Contracts billing the month the invoice goes out in archive as before.

What time of day does a month-just-finished invoice appear?

On the billing day, once the month has ended in your time zone (early morning in US time zones) — the Company time zone under Settings → Company. Invoices for the month they go out in are drafted just after midnight UTC, as before.

I created a monthly contract after this month's billing day. Is this month invoiced?

Only when its start date (or First Billing Month, when later) is in this month, on a contract that bills the month the invoice goes out in. The automatic run drafts a month only on its billing day, just after midnight UTC (the evening before in US time zones), so a contract created after that run — a mid-month signup, or one created during the billing day itself — gets this month's invoice drafted the moment it is created, whether from a signed quote, New Contract or the onboarding import. It is a draft with a note saying why, never sent automatically, and the office gets a notification — one per contract for a signed quote or New Contract, and one for the whole run for an onboarding import ("Import created 200 contracts. 200 invoices for October 2026 were drafted for review."). If the start date (or First Billing Month) is in an earlier month — a backdated start, or a monthly Ongoing or Seasonal quote with blank dates sent in an earlier month, whose term starts on the 1st of the month it was sent — nothing is drafted, this month included, and nothing will draft this month later. A signed quote or New Contract sends the office a notification saying this month was not invoiced; the onboarding import does not, so set First Billing Month on the rows that should bill this month. New Contract avoids this for a Seasonal agreement that started in an earlier month by filling First Billing Month with the current month, so this month is drafted at creation unless you clear the field. Create the months the customer owes for with + Create Invoice; its amber note counts the periods already past. A contract held for a billing check drafts nothing; when it starts billing this month, clearing the check offers this month. Contracts that bill the month just finished are not affected; they bill this month on next month's billing day. If the draft cannot be made, the notification says so; create it with + Create Invoice.

I switched Bill For and OpsVara listed some months with Create now. What are they?

Planned monthly invoices whose new billing day has already passed. Moving the billing day or First Billing Month can list them too. The automatic runs only draft a month on its billing day, so they will not come back for these. Click Create now on each month that still needs an invoice, or leave it if the month was billed another way.

Why is Bill For greyed out?

The contract has a Per visit (billed monthly) row. A per-visit month can only be counted once it has ended, so those plans always bill the month just finished. Remove the row, or change its Price is or How it bills, to unlock it.

A contract that costs $0 a month got no invoice for a month. Is something broken?

No. The automatic monthly run skips a month the plan prices at $0 when no line on it carries money, so you are not left deleting an empty draft every month. It also drafts nothing when the month has something the office would want to review, such as work linked to invoice, usage from the previous term, or no-charge usage, so a $0 draft that does appear is carrying a reminder. The month stays on the plan, and + Create Invoice on the contract still bills it if you want one. A month that is $0 only because of a discount, and any month with money on it, drafts as usual, and so does an invoice you create by hand.

Does changing the company default change my existing contracts?

No. The company default is what a new contract starts from. An existing contract keeps whatever its own Invoice Options say until you edit them.

I set a First Billing Month and the Typical installment went up. Why?

The monthly invoices split the total, and the months before the first billing month get no invoice. A $1,200 term from September to August billed from November has ten invoices, so each is $120, not $100. A Per month price already totals only the billed months, so its installment is the monthly rate — $355 a month billed for November and December is a $710 total and a $355 installment. A Per visit (billed monthly) total is a forecast of the billed months' visits, so its installment is the average forecast month; each invoice bills the visits actually completed.

Does the first invoice bill work done before the First Billing Month?

No. Add-ons and chemicals from visits completed before the first billing month were billed wherever the customer paid for those months, so no monthly invoice picks them up. The visits stay unbilled on their jobs; invoice one from its job if it does need billing. Visits are dated on your company's calendar (Settings, Company time zone), so a visit checked out on the evening before the first billing month belongs to the earlier month, and one checked out on the morning of the 1st is billed. A contract without a first billing month bills unbilled work back to its start date, as before.

A visit was checked out late on the last evening of the month. Which invoice is it on?

That month's. A month ends at midnight in your company's time zone (Settings, Company time zone), not at midnight UTC, so a stop checked out at 8 PM on November 30 in New York is a November visit on every kind of monthly plan — flat, in arrears, or Per visit (billed monthly) — and the last evening of a contract's final month is on that month's invoice rather than left for a draft that never comes. A visit already on an invoice is never billed again when it falls into a window. On a plan that bills the month the invoice goes out in, the invoice is drafted before the month's visits happen, so its add-ons and chemicals are on the next month's invoice as before.

A repair job was linked to a monthly plan. Is it on the monthly invoice?

No. A monthly invoice takes the plan's own visits — jobs of the plan's work type, jobs the plan scheduled itself (such as a Care Schedule task on its own work type), and One-Off Jobs set to Count against contract — with their add-ons and chemicals. A linked repair, any other work type, or a One-Off Job billed Per visit stays unbilled on its job, so invoice it from the job with Create Invoice as usual. The draft's internal note lists each such job by number, work type and day so none is forgotten ("1 completed job linked to this contract is not billed on this invoice… Invoice it from the job"). The job's chemicals are added automatically, and so are the contract's extras ticked on that job that are billed each time they are done (such as a Care Schedule task), at the contract's price. An extra you type as a line yourself is not added a second time, and an extra that is part of the contract price stays on the plan's invoices. Nothing of it is billed twice. A plan with no work type set keeps every linked job on its monthly invoice, as before. The same rules apply on a plan priced Per visit (billed monthly).

Which invoice is a contract visit on?

Open the visit's job page and click the Invoice tab. Once the visit is on an invoice, every work type has the tab for office staff and anyone given Sales and Billing, including a Routine Service or mowing visit on the monthly invoice. It shows the invoice as INV-… · status and says the visit is billed on its contract's invoice. On a work type that bills through its contract, the tab only opens invoices. It has no Create Invoice, so a visit is never charged a second time. Repairs, specialty work, one-off service calls and aquatic visits keep Create Invoice as before. Field crew never see the tab.

What does a One-Off Job's Billing mean on a monthly plan?

The same on every monthly plan, flat or Per visit (billed monthly). No charge means nothing from that visit is billed — not the visit, not its chemicals, not an extra ticked on it; it stays linked to the plan for the record and on no invoice. If something was ticked or logged on it, the draft's internal note says so ("1 One-Off Job marked No charge is not billed, as marked…"), so you know it was left off on purpose; a free visit with nothing on it is not mentioned. Per visit means it is billed from its own job page with Create Invoice, never on the monthly invoice and never counted as one of the plan's visits; the draft's internal note names it. Count against contract means it is one of the plan's own visits, as if the plan had scheduled it — on a per-visit plan it counts at the per-visit rate when it is the plan's work type, and its chemicals and ticked extras ride on the monthly invoice either way.

The 1st of the month drafted invoices for many contracts. Why did I get only one notification?

Each automatic run sends every office user one notification for all the invoices it drafted — "Scheduled invoices created" with the count ("217 scheduled invoices created — review the drafts.") — and it opens the draft invoices list. When the run drafted only one invoice, the notification names it and opens it, as before. Drafts that need something different from you are counted in the same notification by invoice number. One that includes work from the previous term was not sent; review it and send it yourself. One that contract credit already covers was not sent either; open it and choose Close as Paid.

A notification says a scheduled invoice could not be created. What do I do?

Open the contract it names and click + Create Invoice to bill that month. The automatic run drafts a month only on its billing day and does not come back for it, so a month it could not draft stays unbilled until you create its invoice. Each run sends one notification for everything it could not draft — it names up to three contracts and counts the rest, and it is sent even when nothing else was drafted. It is titled Scheduled invoice not created (or Scheduled invoices not created) when the run drafted nothing else, and A scheduled invoice was not created (or Some scheduled invoices were not created) when it also drafted invoices, after the usual count of invoices created. With one contract named it opens that contract; with several it opens the Contracts list, so open each one named. A season-end invoice, and the last month of a contract priced per visit, are tried again each day for a while, so while one keeps failing you are reminded once a week instead of every morning. If Create Invoice also refuses, its message says what is missing on the contract (for example a customer).

Can a Lake Treatment contract be Annual or Ongoing?

Yes. Seasonal is still the round-based lake: treatment rounds (First / Second), the Season (Year) box instead of dates, and invoices after the early and mid-season visits. Annual and Ongoing are dated like a pond contract: Agreement Start and Agreement End on Annual, Service Start and Renews On on Ongoing, a visit schedule, and the normal Invoice Options (Monthly on a fixed day, After each visit, and the rest), with no treatment rounds and no permit season. If Settings → Work Types still has only Seasonal ticked for Lake Treatment, tick Annual or Ongoing under Service terms first.

Related guides