Manage Site Permits

Track lake site permits — number, dates, status, uploaded PDF or photo, past seasons, and other sites that share the same permit number.

Weed Treatment

Updated November 13, 2026

Requires the Site Permits feature. If you do not see it, ask your OpsVara contact whether it is enabled for your account.

Site Permits tracks the regulator-issued record on a lake site — permit number, year, issuing authority, issue and expiry dates, fee, treatment dimensions, and a scanned document. It is not the customer-signed Permit Approvals workflow. Pool, lawn, and generic companies do not get this tab.

  1. Open the list

    Go to DirectoriesSite Permits. Click New Site Permit, pick the catalog lake, then the customer lake site. Tick two or more sites to save one permit on several neighbours: see Put One Permit on Several Sites. The add page says Choose the lake this permit applies to (ponds are not permitted).

  2. Fill the regulator record

    Required is Permit number. Set Status to Draft, Pending, Active, or Archived. Expired is computed from the expiry date — it is not a choice in that list. Year, Issuing authority, Issue date, Expiry date, fee, and treatment dimensions are optional. Click Save permit. Office-tier roles can edit; others see You can view this permit; only admins and office staff can edit.

  3. Upload the scan

    Under Uploaded permit document, click Upload document (or Replace document). Accepted files are PDF, JPEG, PNG, and WebP. This save is separate from Save permit. Empty copy is No scanned permit on file. Upload the regulator's PDF (or a photo of the paper permit) so it's one click away during an inspection. Permit document link is a different field for an https:// URL.

Past Seasons and sibling sites

Past Seasons appears only after history exists. The helper is Archived automatically when a new permit number or season is saved. Read-only. Changing number or year snapshots the previous identity. Editing the same number and year does not. Archived as a status is different — it hides the row from the default list until you change status.

When other active lake sites share the same permit number, the detail page shows Also on this permit: as chips. Saving Draft, Pending, or Active with a number copies that status to those siblings. On a grouped list row, Update Permit writes the shared fields to every site on that row.

Site page and the customer portal

On a lake site, Overview lists permit facts and Permit details →. Empty is No permit on file. Customers with a permit number on file can read Site Permits in the portal (number, year, issued, expires, and lakeshore/lakeward when present). They cannot upload, change status, or see Past Seasons.

On a Minnesota lake, the site page, this permit page, and the lake picker show the DNR lake number — DOW 27067700, or DOW 71001301 (part of lake 71001300) when the site sits on one basin. Other states have no DOW number. On Edit Site, Shoreline Band is an Owned / Requested / Approved grid (lakeshore along the shore, lakeward out from shore). Treatment Area shows Acreage only.

When an approved lakeshore or lakeward is lower than the requested one, the permit is marked The regulator approved less than was asked for on its own, and the note says which and by how much (for example Lakeward: 50 ft approved of 100 ft requested). There is nothing to tick. For a cut the feet don't show, such as another permitted area or a refused permit, tick the box yourself. Either way you can add an optional Reason. Other permitted areas is what the permit allows besides the shoreline — waterlilies, a channel, cattails. Those figures are upper limits: what is treated each season is set on the site's Season plan.

Season Plan

On the lake site page, Season plan is what this property signed up for: which treatments it is in, and how much to treat on each. An empty plan reads No plan for 2026 yet. Jobs for this property treat the approved lakeshore until there is one. Emptying every treatment and saving it does not keep a plan that says no treatments are ticked — after Save Plan the card is that same empty card. Add 2026 plan or Start from 2025 opens the editor; Save Plan writes it. Jobs made afterwards copy those feet; jobs already on the schedule do not. The crew sees Treat this visit with a season plan chip — see Complete a Visit.

If Permit Approvals is on for your company, the site permit may show Signed Permit Applications with a link to DirectoriesPermit Approvals. On that list, filter Lake to one lake to see every permit on it; each row shows the lake and the site. Recording regulator approval there can write the number, dates, and Active status back onto this Site Permit.

On that list, Send (or Resend on one already sent) marks the application sent either way. With All Customer Notifications set to Disabled under SettingsCustomer Notifications, nothing is emailed. The notice reads Permit marked sent, but nothing was emailed: customer notifications are turned off for your company (Settings → Customer Notifications). Share the sign link or print it instead. Turning off the Unsigned permit reminder row by itself does not stop the email — only the master switch does.

Which Permit Fee Invoices Bill

When a lake contract's permit row was built from a quote line (approved on or after November 10, 2026), invoices bill that signed fee for the life of the contract. Changing the fee on the site does not change it — edit the permit line on the contract under Sales and BillingContracts. The contract page notes when they differ (office only); the customer never sees that note. A renewed term bills each lake's current fee. A quote discount also comes off the permit line a draft adds. A row made by hand, a contract approved before that date, or a lake the row does not cover still bills from the site. See After a Quote Is Approved.

Verify it worked

Open DirectoriesSite Permits and find the lake site. Status matches what you saved (or Expired if the expiry day has passed). View uploaded document ↗ opens the scan. A second site with the same number appears under Also on this permit:.

If something is off

What you seeWhat to check
No Site Permits tabThe feature is off for the company, or you are not on the aquatic industry.
Save is blockedThe site is not type Lake, or you are not office-tier.
Past Seasons is missingYou have not yet changed permit number or year (or fully cleared a numbered permit).
Default list hides a rowStatus is Archived. Include Archived in Status, then set Active to bring it back.
Send on a permit application emailed nobodyAll Customer Notifications is Disabled. The application is still marked sent. Share the sign link or print it.

Frequently asked questions

Which permit fee is billed?

The fee the customer signed, when the contract's permit row was built from a quote line (a quote approved on or after November 10, 2026). That fee is billed for the life of the contract. Changing the fee on the site does not change it — edit the permit line on the contract under Sales and Billing → Contracts. The contract page notes when they differ (This contract bills the $X on this line, not the site's fee. Edit this line to change it.). The customer never sees that note. A renewed term bills each lake's current fee. A quote discount also comes off the permit line a draft adds. A permit row made by hand, a contract approved before that date, or a lake the row does not cover still bills from the site, as before. A permit waived on the site is still not billed.

Can I save a permit on a pond?

No. Permits apply to lake sites only. The add flow says ponds are not permitted. Change the site type to Lake and link the catalog lake before you save.

Why did Expired appear? I never picked it.

Expired is not a status you store. When today's UTC calendar day is after the expiry date, the list shows Expired automatically. Extend the expiry date, then set Draft, Pending, or Active again.

Is this the same as Permit Approvals?

No. Site Permits is the regulator record on the lake site (number, dates, scan). Permit Approvals is the customer-signed application workflow (Enterprise). On a site permit you may see Signed Permit Applications when that feature is on.

I clicked Send and the customer got no email.

With All Customer Notifications set to Disabled, Send and Resend still mark the permit sent and email nothing. The notice says to share the sign link or print it. Turning off Unsigned permit reminder by itself does not stop the email.

Do I have to tick The regulator approved less than was asked for?

No, not when the feet show it. If an approved lakeshore or lakeward is lower than what was requested, the permit is marked approved less on its own when you save, on the permit page, the Update Permit dialog and Add a permit. Tick it yourself only for a cut the feet don't show, such as another permitted area or a refused permit.

I emptied the season plan. Why does it still look like there is no plan?

An emptied plan is stored as no plan. After Save Plan, the card is the same empty card as a season that was never started: No plan for 2026 yet. Jobs for this property treat the approved lakeshore until there is one. It does not keep a plan that says no treatments are ticked.

Related guides